Japan approves TSMC's Kumamoto fab 2 switch to 3nm
2026-10-18 · IT之家
According to the website of Japan's Ministry of Economy, Trade and Industry, the plan to switch the second fab of JASM, the Kumamoto joint venture controlled by TSMC, to 3nm has been approved.
Fab 2 was originally planned for 40nm, 12nm and 6nm with total capacity of 63,000 wafers a month: 15,000 at 40nm and 48,000 across 12nm and 6nm. The new plan makes it a 3nm-only fab at 6,000 wafers a month, completing in December 2028 with production starting the same month.
The notice also shows changes at the already-producing Fab 1. It was to make 22/28nm and 12/16nm chips with 55,000 wafers of capacity; it now drops the 12/16nm node and will make 45,000 wafers a month at 22/28nm and 5,000 at 40nm.
Capacity at Fab 2 shrinks sharply, but the process jumps from mature nodes to one of the most advanced, which changes value per wafer and technology level. Earlier reports said the switch lifts total investment to about $17 billion; this notice concerns the approved process and capacity specifications.
For the supply chain, Japan gains advanced-node capacity at home while TSMC expands in several regions. But production starts only at the end of 2028, so near-term supply and demand are unchanged.